1991 - Both the client base and team had grown steadily, and the company started to provide project management services to complement the design consultancy. 1996 - To enable wider coverage of the UK, an office was opened in Cramlington, Northumberland. 2018 - Following the appointment of Simon Roberts-Eagles as a Director, the company decided to restructure and form a Holding Company called BAILEYGOMM Group Limited.
Under this umbrella now comes BAILEYGOMM Design Limited, which is specifically for our design work, and BAILEYGOMM Limited, for construction management works. BAILEYGOMM are an active member of the CIBSE Low Carbon Consultants Scheme and Low Carbon Energy Assessors.
Under this umbrella now comes BAILEYGOMM Design Limited, which is specifically for our design work, and BAILEYGOMM Limited, for construction management works. BAILEYGOMM are an active member of the CIBSE Low Carbon Consultants Scheme and Low Carbon Energy Assessors.
Services
One of BAILEYGOMM's main objectives is original thought and innovative design.
Our projects range from single building refurbishments to full-scale facility development and master plan implementation.
Our creative approach to planning and building control enables our projects to progress through all stages of development.
We take health and safety issues seriously and ensure our staff are up-to-date with all relevant regulations, standards and codes of practice, including the CDM Regulations.
Risks are designed out at an early stage, including any future maintenance issues with plant or equipment.
Our projects range from single building refurbishments to full-scale facility development and master plan implementation.
Our creative approach to planning and building control enables our projects to progress through all stages of development.
We take health and safety issues seriously and ensure our staff are up-to-date with all relevant regulations, standards and codes of practice, including the CDM Regulations.
Risks are designed out at an early stage, including any future maintenance issues with plant or equipment.
BAILEYGOMM is a specialist Design Consultancy within the Built Environment and is experienced in engineering and infrastructure projects, from single building refurbishments, to full-scale facility development and Master Plan implementation.
The company works in all sectors, which provides great cross-fertilisation of ideas between different work genres.
Our resources incorporate a full Mechanical, Electrical and Public Health design team enabling us to provide comprehensive support for any project.
The company works in all sectors, which provides great cross-fertilisation of ideas between different work genres.
Our resources incorporate a full Mechanical, Electrical and Public Health design team enabling us to provide comprehensive support for any project.
BAILEYGOMM have been assessed and approved to BS EN ISO 9001:2015 and ISO 140001:2015 for our Integrated Quality and Environmental Management System in Design Consultancy, Engineering, Construction and Project Management Services.
We are a Silver Member of Constructionline, after completing their rigorous health and safety assessment.
We are a Silver Member of Constructionline, after completing their rigorous health and safety assessment.
Building Information Modelling - or BIM - is the process of designing and modelling a building collaboratively.
It uses a single system to combine architectural, structural and building services elements into a single 3D model.
BIM offers both the client and BAILEYGOMM enormous gains by saving time and cost, providing much greater project continuity and reduced risk, and the avoidance of error, alterations or re-work due to lack of information.
Adopting BIM involves more than simply changing the software we use, but the way in which buildings are designed.
It uses a single system to combine architectural, structural and building services elements into a single 3D model.
BIM offers both the client and BAILEYGOMM enormous gains by saving time and cost, providing much greater project continuity and reduced risk, and the avoidance of error, alterations or re-work due to lack of information.
Adopting BIM involves more than simply changing the software we use, but the way in which buildings are designed.
We are partnered with The John Warner (secondary) School in Hoddesdon, mentoring students in engineering and attending engineering open days.
This year (2019) we have had 3 students come and spend a week with us doing work experience.
We organise annual contributions and fundraising events, with the proceeds donated to a local charity of the staff's choice.
This year (2019) we have had 3 students come and spend a week with us doing work experience.
We organise annual contributions and fundraising events, with the proceeds donated to a local charity of the staff's choice.
Reviews
Be the first to review Bailey Gomm.
Write a Review