Our clients include South Hook LNG, Dragon LNG, Valero Energy, Puma Energy, SEM Logistics, Huntsman Corp, RWE nPower, BPA, Amec Foster Wheeler, Rhyal Engineering, Jenkins & Davies Engineering and Milford Haven Port Authority. We undertake groundworks, roadworks, drainage, demolition and reinforced concrete construction works. We undertake grit blast preparation to quality Sa 2 1/2, Apply industrial Hempel Paint to quality standard C5M and can complete works by Rope Access methods.
We install & maintain both International Paint's Chartek and Promat's Fendolite passive fire protection systems. We install Rawell Rawmat system for new or retrofit petro chemical resistant impervious bund lining. We provide full scope facilities civil, grounds and building maintenance contracts on agreed rates and terms. We supply labour for safety observers, firewatchers or civil works during turnarounds or upgrades.
Have been carrying out works on a property in Tenby, which involves specialist roofing materials to provide high quality and long lasting protection for the roof.
We install & maintain both International Paint's Chartek and Promat's Fendolite passive fire protection systems. We install Rawell Rawmat system for new or retrofit petro chemical resistant impervious bund lining. We provide full scope facilities civil, grounds and building maintenance contracts on agreed rates and terms. We supply labour for safety observers, firewatchers or civil works during turnarounds or upgrades.
Have been carrying out works on a property in Tenby, which involves specialist roofing materials to provide high quality and long lasting protection for the roof.
Services
Have been carrying out works on a property in Tenby, which involves specialist roofing materials to provide high quality and long lasting protection for the roof.
JOP are approved contractors and applicators of specialist Decothane products.
The initial roofing works involved installing a raised GRP trim, followed by the priming of the roof itself before installing a Vaper Carrier layer.
The detail work was carried out by using Decothane Ultra base coat and re-mat embedded into it, which covered not only the flat surface, but the incline as well.
JOP are approved contractors and applicators of specialist Decothane products.
The initial roofing works involved installing a raised GRP trim, followed by the priming of the roof itself before installing a Vaper Carrier layer.
The detail work was carried out by using Decothane Ultra base coat and re-mat embedded into it, which covered not only the flat surface, but the incline as well.
JOP Ltd were awarded the contract to carry out intumescent fireproofing on the new steel structure expansion for Puffin Produce in Haverfordwest.
The work involved prepping the steel work, priming it and apply the fireproofing with rollers and brushes before top coating (as requested by the client in an anthracite grey).
All of the outside steel work has now been fireproofed and top coated.
The work involved prepping the steel work, priming it and apply the fireproofing with rollers and brushes before top coating (as requested by the client in an anthracite grey).
All of the outside steel work has now been fireproofed and top coated.
JOP Ltd were awarded the contract to carry out fire proofing on the new steel structure for a new clubhouse at Seasons cottages holiday park in Laugharne.
The principal contractor carrying out the building works were WB Griffiths and JOP worked under them whilst carrying out the fire proofing.
The work involved prepping the steel work, priming it and spraying the fireproofing before top coating.
Due to two areas of the clubhouse being high in moisture (swimming pool and sauna areas), a specific type of top coat was needed to provide an extra layer of protection to the fire proofing.
The principal contractor carrying out the building works were WB Griffiths and JOP worked under them whilst carrying out the fire proofing.
The work involved prepping the steel work, priming it and spraying the fireproofing before top coating.
Due to two areas of the clubhouse being high in moisture (swimming pool and sauna areas), a specific type of top coat was needed to provide an extra layer of protection to the fire proofing.
JOP Limited have recently completed a civil engineering project to upgrade the existing Car Parking facilities for our valued client South Hook LNG Terminal.
The project required traffic management, excavation, laying drainage, installing new lighting, paving, kerbs, tarmac and white lining.
JOP Limited performed the role of CDM Principal Contractor on this project which was completed on time and with zero health, safety or environmental incidents or accidents.
JOP Ltd have recently completed works to remediate, cut & fill and install an impervious capping layer over an area of 25,000 m2 for BPA in Buncefield Terminal, Hemel Hempstead.
The project required traffic management, excavation, laying drainage, installing new lighting, paving, kerbs, tarmac and white lining.
JOP Limited performed the role of CDM Principal Contractor on this project which was completed on time and with zero health, safety or environmental incidents or accidents.
JOP Ltd have recently completed works to remediate, cut & fill and install an impervious capping layer over an area of 25,000 m2 for BPA in Buncefield Terminal, Hemel Hempstead.
Reviews
Be the first to review J O P.
Write a Review