Realtime Civil Engineering
Call now
Call now
Website
Call
Realtime Civil Engineering
Realtime Civil Engineering has been successfully trading since 1989 and has grown to become one of the leading groundwork's contractors in the London and Home Counties regions. Realtime have gained a reputation from some of the country's top contractors and through prestigious clients of providing a quality service with a non confrontational approach thus leading to a large amount of repeat business.

Please take a look at some of most recent projects to see how we have helped many contractors within the commercial, residential, educational and health care sectors. Qualified, professional and dedicated team with long standing experience within the industry. Proven track record and long standing harmonious client relationships ensures repeat business.
Services
Realtime have vast experience in enabling works including demolition, sub-structure construction and superstructure concrete frame construction.
All types of excavation works can be provided including, site clearance, bulk excavation, dewatering, earthwork support and disposal of excavated material.
Realtime can provide various types of foundation solutions such as strip founds, pads, pile caps, ground beams and raft foundations.
We cover all basement works including piling, excavation, temporary works, concrete, reinforcement formwork and waterproofing.
Realtime Civil Engineering Limited are committed to the prevention of injury and ill health, and providing a safe working environment for our employees and others who may be affected by our activities.
We are passionate about achieving the highest levels of health and safety performance through continual improvement.
The existing floors of the rear auditorium at the Shaftesbury Theatre are to be lowered to provide better access in and around the theatre and into the planned basement located beneath the Bloomsbury street pavement.
The works consists of service isolations, demolishing of existing fabric, underpinning, formation of new manholes and drainage runs, new RC slabs, basement formation and basic fit out to allow the theatre to reopen to the public.
Realtime were part of the team whom delivered a new mixed-use research and development building including a centralised carparking facility for the estate.
Works included diversions of existing site services including steam, HV & LV Foul drainage and site wide gas supply.
Piling attendance, capping beam construction, temporary works design and installation and reduced level dig.
Installation of all sub-structure works including drainage and services, pile caps, raft slabs, vertical elements from basement to ground floor including waterproof liner walls.
During the construction of the new police investigation centre we carried out the site remediation works, reduced level dig, pile cap construction and all concrete works to the ground and upper floors.
The external works comprised of preparation for soft landscaping, fence and street furniture installation, tarmac and block paving.
Reviews
Review Realtime Civil Engineering

Be the first to review Realtime Civil Engineering.

Write a Review